![Sno-Motion Sno-Motion](https://sno-motion.com/wp-content/uploads/2023/12/02.jpg)
![Sno-Motion Sno-Motion](https://sno-motion.com/wp-content/uploads/2023/12/01.jpg)
CNG High-Pressure Manifold Innovation
High-Pressure Manifold System
The HPM system incorporates all of the features and components required by NFPA 52 for the high-pressure portion of the system. With this system, an installer can hook up only 3 lines to this manifold. This will greatly reduce installation time and reduce cost.
- Inlet From the Fill Receptacles
- Inlet From the Cylinder
- Outlet From the Fuel Rail
This is a modular system that can include any or all of the following components
- Secondary Check Valve for the Fill port
- Quarter Turn Shut Off With Vent
- High Pressure Solenoid Lock Off
- High Pressure Transducer
- Pressure Gauge
- Coalescing Filter
- Regulator of Choice
Compliance
![rs=w_1440,h_1440 (34) rs=w_1440,h_1440 (34)](https://sno-motion.com/wp-content/uploads/2024/01/rsw_1440h_1440-34.webp)
![rs=w_1440,h_1440 (36) rs=w_1440,h_1440 (36)](https://sno-motion.com/wp-content/uploads/2024/01/rsw_1440h_1440-36.webp)
![rs=w_1440,h_1440 (35) rs=w_1440,h_1440 (35)](https://sno-motion.com/wp-content/uploads/2024/01/rsw_1440h_1440-35.webp)
![rs=w_1440,h_1440 (37) rs=w_1440,h_1440 (37)](https://sno-motion.com/wp-content/uploads/2024/01/rsw_1440h_1440-37.webp)
Sno-Motion Line Card
![Sno-Motion Sno-Motion](https://sno-motion.com/wp-content/uploads/2023/12/LineCard1.webp)
![Sno-Motion Sno-Motion](https://sno-motion.com/wp-content/uploads/2023/12/LineCard2.webp)
Fuel Valve
Sno Motion Solutions can provide CNG Fuel Vales, both horizontal and Vertical
CNG/NVG Products Catalog
Sno-Motion Solutions is a qualified and certified assembly facility for ZEC hose assemblies, for hose sizes 1/4 thru 3/4 inch lines Single and dual hose. Fittings to meet your needs.